G.01 Contract for global consultancy with specific performances
Yearly consultancy along with, for example, initial check-up, specific areas sampling, specific risks databases, etc.
G.02 Preliminary global check-up
Initial verifications for local conditions, equipment, machineries, plants, D.P.I., etc. and environment problems.
G.03 Formalizations of procedures and operative instructions
Evaluation of company areas, predispositions of procedures for safety and environment.
G.04 Notification for New/Modified/Trasfered production plants
Required documentation according to standards and local administration for new productive plants or modifications/transfers of existing ones.
G.05 Technical and Law consultancy
Elaborations treated by Technical Administration and Law Office for the interpretation of very complex situations.
G.06 Formalised procedures for First Aid
First Aid procedures applicable to the principal risks connected to plant works.
G.07 Integration of Safety System, Quality system and Environment system
Integrated systems, ISO 9000 – ISO 14000 /EMAS– BS 8800 (626/94) standards. |